|
|||||||||
| PREV CLASS NEXT CLASS | FRAMES NO FRAMES | ||||||||
| SUMMARY: NESTED | FIELD | CONSTR | METHOD | DETAIL: FIELD | CONSTR | METHOD | ||||||||
java.lang.Objectwt.fc.EnumeratedType
wt.projmgmt.msproject.ImportMode
public class ImportMode
This EnumeratedType is used to specify how conflicts are
handled during a Microsoft Project Plan import operation.
For example, this type can be used to specify whether imported objects
should:
PTC Project Plan,
PTC Project Plan regardless of what
other objects are already in the plan or,
PTC Project Plan
| Field Summary |
|---|
| Fields inherited from interface wt.meta.EnumeratedType |
|---|
DEFAULT_VALUE, ORDER, SELECTABLE |
| Method Summary | |
|---|---|
static ImportMode |
getImportModeDefault()
Returns the default value (instance) for the ImportMode set. |
static ImportMode[] |
getImportModeSet()
Returns a copy of the set of valid values (instances) for the ImportMode class. |
EnumeratedType[] |
getValueSet()
Returns a copy of the set of valid values (instances) for this instance, for the current user locale. |
static ImportMode |
toImportMode(String internal_value)
Returns the ImportMode instance for the internal_value argument. |
| Methods inherited from class wt.fc.EnumeratedType |
|---|
equals, getAbbreviatedDisplay, getDisplay, getDisplay, getFullDisplay, getLocalizedMessage, getLongDescription, getOrder, getSelectableValueSet, getShortDescription, getStringValue, getStringValue, hashCode, isDefaultValue, isDefaultValue, isSelectable, main, toEnumeratedType, toEnumeratedType, toString |
| Methods inherited from class java.lang.Object |
|---|
clone, finalize, getClass, notify, notifyAll, wait, wait, wait |
| Method Detail |
|---|
public static ImportMode toImportMode(String internal_value)
throws WTInvalidParameterException
internal_value - The internal (persistent) value for a valid instance of ImportMode.
WTInvalidParameterExceptionpublic static ImportMode getImportModeDefault()
public static ImportMode[] getImportModeSet()
public EnumeratedType[] getValueSet()
getValueSet in class EnumeratedType
|
|||||||||
| PREV CLASS NEXT CLASS | FRAMES NO FRAMES | ||||||||
| SUMMARY: NESTED | FIELD | CONSTR | METHOD | DETAIL: FIELD | CONSTR | METHOD | ||||||||