|
|||||||||
| PREV CLASS NEXT CLASS | FRAMES NO FRAMES | ||||||||
| SUMMARY: NESTED | FIELD | CONSTR | METHOD | DETAIL: FIELD | CONSTR | METHOD | ||||||||
java.lang.Objectwt.fc.EnumeratedType
wt.projmgmt.msproject.TaskScope
public class TaskScope
This EnumeratedType is used to specify the scope of a Microsoft
Project Plan import or export operation. The scope determines
what objects are imported into a PTC Project Plan or what
objects are exported to a Microsoft Project Plan. For example,
this type can be used to specify whether:
| Field Summary |
|---|
| Fields inherited from interface wt.meta.EnumeratedType |
|---|
DEFAULT_VALUE, ORDER, SELECTABLE |
| Method Summary | |
|---|---|
static TaskScope |
getTaskScopeDefault()
Returns the default value (instance) for the TaskScope set. |
static TaskScope[] |
getTaskScopeSet()
Returns a copy of the set of valid values (instances) for the TaskScope class. |
EnumeratedType[] |
getValueSet()
Returns a copy of the set of valid values (instances) for this instance, for the current user locale. |
static TaskScope |
toTaskScope(String internal_value)
Returns the TaskScope instance for the internal_value argument. |
| Methods inherited from class wt.fc.EnumeratedType |
|---|
equals, getAbbreviatedDisplay, getDisplay, getDisplay, getFullDisplay, getLocalizedMessage, getLongDescription, getOrder, getSelectableValueSet, getShortDescription, getStringValue, getStringValue, hashCode, isDefaultValue, isDefaultValue, isSelectable, main, toEnumeratedType, toEnumeratedType, toString |
| Methods inherited from class java.lang.Object |
|---|
clone, finalize, getClass, notify, notifyAll, wait, wait, wait |
| Method Detail |
|---|
public static TaskScope toTaskScope(String internal_value)
throws WTInvalidParameterException
internal_value - The internal (persistent) value for a valid instance of TaskScope.
WTInvalidParameterExceptionpublic static TaskScope getTaskScopeDefault()
public static TaskScope[] getTaskScopeSet()
public EnumeratedType[] getValueSet()
getValueSet in class EnumeratedType
|
|||||||||
| PREV CLASS NEXT CLASS | FRAMES NO FRAMES | ||||||||
| SUMMARY: NESTED | FIELD | CONSTR | METHOD | DETAIL: FIELD | CONSTR | METHOD | ||||||||